
MHR is proficient with the civil design for commercial developments that include apartment projects. Engineers at MHR work closely with the architects and engineers (MEP and structural) throughout the entire development process from pre-design, design and permit submittals to construction administration stage.
Major areas
- Site Plan
- Parking Lot Layout & Design
- Grading Plan
- Drainage Design
- Traffic Impact Study
- Utility Plan
- SWPPP Plan
- Fire Protection Plan
- Fire Flow Calculations
- Water Modeling
- Water & Sewer Main Design
- Utility Service Agreement
- TxDOT Driveway Permit
PROJECTS
EXPERIENCES WITH KEY PROJECTS:
Spring at Bandera Apartment Project, San Antonio, Texas- Site grading, drainage analysis with a detention pond, traffic study, water pollution abatement plan with a water quality pond (TCEQ), utility plan, fire flow calculations, and TxDOT driveway permit.
Casa Bella Civic Center, San Antonio, Texas- Site grading, parking lot layout design, storm sewer system design, detention pond design, water pollution abatement plan with a water quality pond (TCEQ), utility service agreement (SAWS), utility plan, fire flow calculation for water main and fire line, off-site water and sewer main design and Edwards Aquifer Protection Plan (SAWS)
Hampton Inn Hotel, New Braunfels, Texas- Site grading, parking lot layout design, drainage design with a detention pond, fire flow calculations for the fire line, TxDOT driveway permit.
Oldcastle Pre-cast, San Antonio, Texas- Site grading, fire flow calculation, drainage study that includes a low water crossing design